SANY UK – Depot Relocation

Time-Critical Depot Relocation for SANY UK Heavy Machinery

The Challenge

In December, Premier Plant Haulage was appointed to deliver a full depot relocation for SANY UK Heavy Machinery, supporting the move from their Larkfield site to a new, larger facility in Sittingbourne.

The project involved relocating a substantial fleet of plant and infrastructure, including forklifts, excavators, buckets, quick hitches, a washing station, and additional ancillary equipment. Each item required different weight, size, and handling requirements, demanding precise planning and execution.

With SANY UK operating to a tight programme and a limited window to fully clear the outgoing site, the margin for disruption was minimal. The challenge was clear: complete a complex, high-volume relocation safely, efficiently, and within a demanding timeframe.

The Solution

Premier Plant Haulage delivered a fully managed, end-to-end logistics solution, carefully planned to maintain momentum and minimise operational downtime.

Our approach included:

  • Detailed pre-move planning to sequence loads and maximise vehicle efficiency
  • Specialist loading and off-loading, carried out entirely by our experienced haulage team
  • 13 coordinated round trips, executed safely and to schedule
  • On-site management to ensure smooth operations and rapid issue resolution

By deploying modern flatbed haulage vehicles, experienced drivers, and proven lifting and securing procedures, Premier Plant Haulage ensured every movement was controlled, compliant, and safe.

The Result

Despite the scale and complexity of the relocation, the entire Larkfield depot was cleared within just 3.5 days, impressively finishing ahead of schedule and enabling SANY UK to transition seamlessly into their new Sittingbourne facility.